International Women’s Day

Dear friends
So life keeps going with all that it brings. 

The funnies: –
Me: (on why there’s a mid season break for extended filming) I don’t think it worked like that in my day!
Daur2: What?  You twerked in your day!!??

The compliment: –
Local Heritage officer: (on looking at my latest project) A very well designed extension.
This is why I’m an architect,  I love creating spaces for all to appreciate 🙂

The surprising/ thought provoking: –
Female friend (mother of 2, same age as me and the LDS seminary teacher): It is cancer. Their going to operate next month,  remove it completely and I have to decide on whether to have reconstructive surgery later in the year.  It helps to talk about it.

And then Mothering Sunday: –
My mother: (after lovely dinner prepared by my dear husband and why it’s not Mother’s Day) It originally started so those downstairs [ie servants] could visit their homes/ mothers at least once in the year. 
My children and husband (expressions – similar – in a card): Thank you for being the best Mummy!!

Latest read: – I’m reading Anil’s Ghost by Michael Ondaatje – I’ve read it before; it’s one of my older books retrieved from the garage last spring; it’s a great,  poetic read. 

Latest on running: – I’ve been running a little bit during these wintry mornings – I need to improve my stamina!  but my latest running partner (another mum with dog during early morning seminary) will be teaching seminary (in the absence of the teacher for surgery),  so I’m not sure whether to go down to the park to run on my own… it’s quite light in the mornings now but it’s a big grass and woodland area.  There are other runners… I’ll think on that one.

image
View on my typical early morning run

Finally, to international women’s day, that this is, I can’t say I’ve done anything particular but I did decide (yesterday) to go to the LDS women’s conference on Saturday – I didn’t have much choice,  my mum declared she wasn’t going if I wasn’t!  I also thought on how if we don’t support such activities and conferences, they won’t be organised. It simply means a whole Saturday out… at least a friend is driving this year (it’s towards London).  The workshops do look quite interesting and despite my cynicism, I know I will enjoy the day, and probably meet some old friends.  

After all this,  I recognise that our family is greatly blessed by our Father in Heaven.  I am very grateful for where we live and the time we live in and the opportunities we have.  A different place,  a different generation,  and we would be living very different lives. That goes for all of us.  Take care. 

Advertisements

a thought on work

Dear friends

The scaffolding has been coming down on one of my projects, we’ve been on site about 18 months, with another 3 months or so left, and finally we can appreciate what legacy we will leave for the city. It’s quite exciting – I’ll post photos in a different post.

Leaving site last week I felt a renewed excitement, for my current job. And for projects I’m currently working on, at design stage.  I also began thinking on why I initially wanted to work on public sector projects, like schools.  Because with public projects, I feel a responsibility to design and deliver the best for the whole community. The challenge is its funded by the community, by government funding, from our taxes.

Meanwhile, I submitted the planning application for a new school building on the east side of town.  This is a little controversial with locals since it’s proposed on a disused playing field used, by some locals, as a dog toilet and bus shortcut through the broken fence.  I feel we’ve given some valid reasons why it should be developed for the school, which is expanding.  We’ll see if the planning authority agrees in a few months. 

We’re having an architectural team management meeting in Starbucks or Costa, or similar!  Three of us 🙂  it’ll be a welcome respite with my two senior colleagues that I’ve been with for over 8 years…  (Later…) we had our meeting (Costa) and I felt decidedly guilty as our team leader said he saw the team moving forward with us three… that was not the time to reveal I’d updated my CV and am looking for a new job…

blogging… et al

Dear friends

I’ve been having a bit of a blog designing session – and it’s all left me feeling exhausted.  It began yesterday with Daur1 designing a blog logo/ banner and has ended with me trying on and off various themes to find one that I feel portrays me!  For a designer of buildings, I’ve found it difficult to get my head round why certain themes don’t do certain things and although there’s probably some add-on/ plug-in that can be done, I’m not into the technological aspects that badly.  I simply want it to be attractive, easy to read and navigate, and reflect a part of me. What do you think?

I return to work tomorrow after two weeks on leave so that is probably adding to the exhausted and stressed feelings.  Although, it is all change in a few weeks; the assistants will go back to university and we will have at least one new one.  And a couple of the projects were at feasibility and concept design stage so it will be good to work a little more conceptually while others are still on holiday.  Despite my moans about work, I do enjoy being an architect!

I’ve had quite a few thoughts about what I want to write about – there’s clearly the whole death of a lion issue versus death of a negro; I’ve been doing family history and have been thinking on how I bear the signs of yesteryear; a new shopping centre has received planning permission and it looks like another ship (I need to do a blog on how many buildings in our town look like ships).

I think I’ve shared this scripture before but it does seem very appropriate for all the eclectic thoughts going round my mind, from Mosiah chapter 4, verse 27, King Benjamin’s words:

And see that all these things are done in wisdom and order; for it is not requisite that a man should run faster than he has strength. And again, it is expedient that he should be diligent, that thereby he might win the prize; therefore, all things must be done in order.

work – an American and engineers…

Dear friends

We’re on project manager number 5 on a new school project in about 3 months and we’re only at feasibility stage!! Don’t ask!  I feel the project is already doomed  – it doesn’t help that the client has not confirmed adequate funding. This PM is new to the business and is American – his Mum is British. I asked what brought him to the UK – I think it’s not impolite enough to ask when someone says they’re from Manhattan!!  His accent is slight, in a Davy Jones of The Monkees sort of way, so I didn’t ask straight away.  And he’s had some architectural training and seemed familiar with a traditional building procurement process 🙂 that’s refreshing because he may have some appreciation for our discipline rather than tip toeing around us like we’re going to get upset and all passionate about our designs!! Like that ever happens…

I was getting exasperated with the structural engineers.  When I arrived into work yesterday (after outnumbered day 10), I found 4 or 5 drawings for a reinforced concrete foundation and a steel frame for me with a note from the technician – for coordination and comment.  Today, they (their team leader) were already (email) chasing me because the contract administrator was chasing them – the drawings were due to be issued 2 days ago.  So, I red penned their drawings, signed and dated, and emailed their leader back stating – the columns clash with manholes.  Fortunately the technician still speaks with me and came over to discuss the red pen notes, finally saying, oh [leader] said it was much worse!!  Red pen, gets them every time!!! 😉

Give me building services engineers any time 🙂 – that’s the mechanical, drainage and electrical engineers – always so accommodating – of course, Mrs Architect, you can have a large, circular hole in the middle of that floor if you want it, simply give me a decent sized plant room!!  I know structures are keeping the building standing up but they’re always so inflexible – Mrs Architect, allow for 205mm columns on a 4m perpendicular grid with a structural roof zone of 500mm and you should be OK. You mean, you should be OK! And then, they have notes on drawings – like waterproofing to architect’s details – without telling you! So, I guess on the positive side, it’s good that I’ve been given the chance to review their drawings before they’re issued to the contractor.

As for our new PM, I simply hope he lasts longer than the other PMs and he’s met the client now, so if he departs questions will be asked.